Veľká Domaša is the 4th largest water reservoir in Slovakia, it was built in the Bodrog basin on the Ondava River in the years 1962 – 1967 as a part of water management adjustments on the East Slovak Lowland. Its purpose is water accumulation at higher flow rates, flood protection, exploitation of hydro-energy potential, recreation and sport.
The construction of the waterworks Veľká Domaša took 6 years. It started in February 1962 and ended in December 1967. The injection tunnel began to be established in August 1963. The flow of Ondava was diverted to the communication tunnel in June 1964. adit. The earth dam was completed in September 1966. At that time, the reservoir was first filled – 01 November 1965, when the construction of the buffer reservoir Malá Domaša was completed. The hydroelectric power plant on the dam was completed in December 1966 and a year later, in December 1967, the construction of the entire waterworks was completed.
The 49th parallel of north latitude passes through the dam of Veľká Domaša.
The water work is administered by the Slovak State Water Management Company.

Address

Our Address:

-

GPS:

49.014535848376, 21.699054807497

Telephone:

-

Email:

-

Planifier mon itinéraire

Claim Listing

The font of the used text

Claim Listing
Click on button to show the map.

Leave a Review

Price
Location
Staff
Services
Food
Publishing ...
Your rating has been successfully sent
Please fill out all fields
Captcha check failed